By NZPA
|
Tuesday 24th July 2007 |
Text too small? |
Pan Pacific Petroleum, which has a 10% interest in Tui, said that at 6am today the Ocean Patriot drilling rig was preparing to lift anchors at the Pateke-3H well.
It would be moving to the Hector prospect, to the southwest, to drill the first well in an upcoming Taranaki basin exploration programme.
David Salisbury, chief executive with New Zealand Oil & Gas, which has 12.5% of the Tui development, said other work at Tui was at an advanced stage and he was feeling confident about the chance of first oil by the end of the month.
NZOG said previously that the Tui oilfields were estimated to contain 27.9 million barrels of recoverable oil.
It was estimated that Hector, if successful, could contain up to 60 million barrels.
The other companies involved in Tui are AWE New Zealand Pty with 20%, New Zealand Overseas Petroleum Pty with 22.5%, and Mitsui E & P New Zealand with 35%.
No comments yet
CVT - Comvita Limited director nominations
September 4th Morning Report
BRW - Revised offer from Floorscape Limited for 100% of Bremworth
WIN - Winton Appoints Michael Stiassny as Independent Chair
WCO - Offer of new shares to selected investors
GNE - Genesis secures additional gas to strengthen fuel portfolio
FSF - Fonterra provides update on forecast FY26 earnings
September 2nd Morning Report
TWL - Amendments to Notice of Annual Shareholders' Meeting
Devon Funds Morning Note - 01 September 2026