Sharechat Logo

Hawaiki Submarine Cable begins commercial operations

Friday 20th July 2018

Text too small?

Hawaiki Submarine Cable has begun commercial operations for its 15,000 km fibre optic deep-sea cable linking Australia, New Zealand, the Pacific and the United States.

The US$300 million Hawaiki Submarine Cable System "is the fastest and largest cross-sectional capacity link between the U.S. and Australia and New Zealand. It will significantly enhance our connectivity to the rest of the world and, ultimately, improve the everyday lives of our communities," said Hawaiki chief executive Remi Galasso in a statement.  

The cable, which has enough fibre to run more than twice around the equator, can transmit 43.8 terabits per second or 80,000 times the average satellite link. 

According to Hawaiki, at that speed, you could download more than 8,500 high definition DVD per second or stream 1.7 million 4K TV streams simultaneously. 

Anchor customers include Amazon Web Services, Vodafone, American Samoa Telecommunications Authority and Research and Education Advanced Network New Zealand.

"For consumers and businesses hungry for more and more data it means faster, better internet, and fewer bottlenecks, particularly when data is streamed from overseas," said  Broadcasting, Communications and Digital Media Minister Clare Curran.

 The new cable also provides greater resilience by providing an additional physical data link to the rest of the world, as it takes a different route to existing cables.

Completion of the project is especially timely for South Pacific nations, which are seeing demand for capacity growing by 45 percent year-on-year, said Galasso, noting it has been specifically designed to meet these expanding requirements. 

Hawaiki has included several stubbed branching units to enable the future connection of New Caledonia, Fiji and Tonga. American Samoa will be connected from day one, he said. 

The cable is a "game changer" for the digital landscape in American Samoa, said Lolo M. Moliga, governor of American Samoa. 

The construction of Hawaiki cable system, including the marine survey, design, manufacturing and cable laying, took 27 months and was undertaken by TE SubCom.

(BusinessDesk)

  General Finance Advertising    

Comments from our readers

No comments yet

Add your comment:
Your name:
Your email:
Not displayed to the public
Comment:
Comments to Sharechat go through an approval process. Comments which are defamatory, abusive or in some way deemed inappropriate will not be approved. It is allowable to use some form of non-de-plume for your name, however we recommend real email addresses are used. Comments from free email addresses such as Gmail, Yahoo, Hotmail, etc may not be approved.

Related News:

NZD headed for 0.6% weekly gain against greenback
PREVIEW: RBNZ tipped to keep cash rate at 1.75%, reiterate next move could be up or down
Sky TV hires Deloitte partner as fill-in CFO
Vector fined $3.6 mln in industry first
SIS Group to partner with Platform 4 Group
Dry weather cutting dairy production, boosting power costs
22nd March 2019 Morning Report
NZ dollar dips back below 69 US cents, focus shifting to RBNZ
Top Energy's geothermal expansion to cut lines charges
MARKET CLOSE: NZ shares rise on Fed restraint, local GDP growth; Auckland Airport slides

IRG See IRG research reports